Country | < 2kg | 2.01 – 10 kg | 10.01 – 30 kg | 30.01 – 40 kg | 40.01 – 72 kg |
|---|---|---|---|---|---|
BE
| Free | Free | 4.8€ vat excl. | 9.8€ vat excl. | 14.8€ vat excl. |
NL-LU-DE
| Free | Free | €9.80 excl. VAT | €14.80 excl. VAT | €19.80 excl. VAT |
FR | €4.80 excl. VAT | €9.80 excl. VAT | €14.80 excl. VAT | €19.80 excl. VAT | €39.60 excl. VAT |
IT-ES-PT-AT | €12.80 excl. VAT | €14.80 excl. VAT | €19.80 excl. VAT | €24.80 excl. VAT | €44.80 excl. VAT |
DK-FI-SE-GB-BG-HR-HU-IE-LV-LT-PL-RO-SK-SI-CZ-EE-GR | €12.80 excl. VAT | €14.80 excl. VAT | €19.80 excl. VAT | €28.80 excl. VAT | €54.80 excl. VAT |
NO-CH | €17.80 excl. VAT | €19.80 excl. VAT | €24.80 excl. VAT | €28.80 excl. VAT | €64.8 excl. VAT |
At Finres, we understand the importance of receiving your orders quickly and smoothly. That’s why we commit to shipping your items within 2 business days of your order. Delivery will then take 1 to 5 business days depending on the destination.
We’ve partnered with UPS, the world’s leading logistics company, to offer you fast, high-quality delivery.
We ship our products throughout Europe. So whether you’re in Paris, Berlin, Rome or Stockholm, we’re here to serve you. If you are located in another region, feel free to contact us to discuss delivery options.
Once your order has been shipped, you will receive a tracking link by email, allowing you to track the progress of your delivery in real-time. This way, you can have peace of mind knowing exactly where your package is and when it will be delivered.
Our commitment to customer satisfaction is reflected in every step of the delivery process. We are here to provide you with a seamless online shopping experience, from start to finish.
Thank you for trusting us with all your delivery needs. We look forward to serving you!
Fast-curing, two-component, solvent-free epoxy repair paste. This product can be used for fast, effective repairs to metal, GRP and plastic surfaces.
106 Metal Repair Paste XF can be applied to manually or mechanically prepared surfaces and will dry in 45 minutes.
Leaky pipe joints
Leaking tank seals
Drilled pump or valve housings
Leaking flange connections
Plate bonding
Resurfacing corroded steel plates
Metal substrates – Hand tools
1. All oil and grease must be removed from the surface using a suitable cleaner such as MEK.
2. All surfaces should be cleaned using a wire brush, metal file, coarse sandpaper, etc.
3. Once abraded, the surface must be degreased and cleaned with MEK or a similar product.
Metal substrates – Mechanical tools
1. All oil and grease must be removed from the surface using a suitable cleaner such as MEK.
2. All surfaces must be mechanically abraded using hand grinders to ISO 8501/4 ST3 (SSPC SP3 ST3).
3. Once abraded, the surface must be degreased and cleaned with MEK or a similar product.
4. All surfaces must be coated before earwax or oxidation appears.
Before mixing, please check the following points:
1. The base component is at a temperature of 15-25°C.
2. Ambient and surface temperature above 5°C.
Once these two checks have been carried out, proceed with mixing the product.
If you are partially mixing the material unit, please follow the instructions below:
1. Using the spatula supplied, place an equal measure of the base and activator units on the mixing table provided.
2. Be sure to clean the spatula thoroughly after measuring the base component and before measuring the activator component.
activator.
3. Mix the two components until you obtain a streak-free mixture (medium grey) on the mixing chart.
4. Make sure there is no unmixed material on the spatula or mixing table.
5. Once mixing has begun, the material must be used within 5 minutes at 20°C.
1. Using a spatula or applicator tool, apply the material to the prepared surface.
2. Ensure that the product is pressed into any holes, scars or cracks.
3. Once the repair is complete, smooth out any imperfections with a gloved hand.
At 20°C, applied materials should be allowed to harden for the times indicated below before being subjected to the conditions indicated.
These times will be extended at lower temperatures and reduced at higher temperatures:
Service life 5mins
Dry hard/machining 45 minutes
Full cure 4 hours
Minimum – the applied material can be covered as soon as it is dry to the touch.
Maximum – covering time must not exceed 4 hours.
Once the maximum recovery time has been exceeded, allow the material to harden before sanding to remove surface contamination.
Mixed material – Medium grey
Basic component – Black
Activator component – white
5 years if unopened and stored under normal dry conditions (15-30°C/ 60-86°F).



